Focused arrival windows
Useful updates and clear arrival timing.
Roof Installation Huntsville TX means more than nailing down shingles. It means a deck that sheds water, a ridge vent that moves attic heat, and flashing that survives hail season. We install asphalt, metal, and flat roof systems for homeowners and commercial property owners across Huntsville, Texas. If your roof is 15 years old or you have storm damage, we will give you a straight answer and a written price before we start.
Useful updates and clear arrival timing.
Review the approach and price before deciding.
Equipped vehicles and respectful cleanup.
Neighbors serving neighbors with follow-through.
Every roof installation we do covers the full system, not just the shingles. Here is what is included in a standard scope, and what we quote separately if your roof needs it.
We remove the old shingles, underlayment, and flashing down to the deck, then haul it all off in a dumpster we place on plywood to protect your driveway. Most homes need 2 to 4 dumpsters. Tear-off usually takes one day for a standard roof.
We probe the sheathing with a pry bar and replace any rotten or delaminated plywood. Most homes need 2 to 6 sheets. We photograph the repairs so you can see what was replaced before the new roof goes on.
Synthetic underlayment covers the field, and ice and water shield goes in valleys and along the eaves. This is the layer that keeps water out if a shingle ever lifts. We use manufacturer-approved products so your warranty stays valid.
We install new drip edge on every rake and eave, plus step flashing at walls and chimneys. Old flashing is the number one cause of leaks on a new roof. Reusing it is a shortcut we do not take.
A new ridge vent and intake vents keep your attic cooler and extend shingle life. We size the ventilation to your attic volume, not to whatever vent is on the truck. Poor ventilation is a common reason roofs age early in Texas heat.
We run a magnetic sweeper across the lawn and driveway at the end of every workday, blow out your gutters, and remove the dumpster. You should not find nails in your tires or your kid's feet. That is the standard we hold our crews to.
Share what is happening and receive a clear next step from the local team.
Roof Installation Huntsville TX is the full tear-off and rebuild of your roof system, from the deck up. We pull the old shingles, inspect the sheathing for rot, and replace any soft spots before a single new shingle goes down. Then we lay ice and water shield in the valleys and along the eaves, roll out synthetic underlayment across the field, and set new drip edge on every rake and eave. Only then do the shingles go on, followed by ridge vent, pipe boots, and step flashing at the walls and chimney.
Huntsville sits in a hail and wind corridor, and roofs here take a beating. A 2026 estimate for new roof installation cost Huntsville TX usually lands between $9,500 and $24,000 depending on size, pitch, and material. We see a lot of 20-year-old three-tab roofs that lost granules years ago and now leak at the chimney. We also see metal roofs dented by hail and flat roofs ponding water after a hard rain. If you are searching for roof installation near me Huntsville, we cover the whole county and we know what fails first on these roofs.

We walk your roof, check the attic for daylight and water stains, and measure every plane. You get a written scope with material options and a fixed price, usually within 24 hours. If we find hail damage, we document it with photos so your insurance adjuster has what they need. This visit takes about 45 minutes.
Once you approve the scope, we order your shingles, underlayment, and flashing. GAF and Owens Corning products usually arrive within 3 to 5 business days. We give you a firm start date and a weather backup date. You will know which day the dumpster shows up and which day the crew starts.
The crew strips the old roof down to the deck, usually finishing a standard home in one day. We tarp your landscaping and move patio furniture clear. Any rotten sheathing gets replaced and photographed before we move on. You will see the bare deck and the repairs before we cover anything up.
We set ice and water shield in valleys and along eaves, roll synthetic underlayment, and nail drip edge. Then the shingle field goes down with a roofing nail gun set to the correct depth, followed by ridge vent, pipe boots, and flashing. A typical 2,000-square-foot ranch takes 2 to 3 days to finish.
We walk the roof with you, show you the ridge line, the flashing details, and the ventilation. Then we sweep the yard with a magnetic sweeper, blow out the gutters, and haul off the dumpster. You get your warranty paperwork and our number. If anything looks off in the first year, we come back.

Sets shingle nails at the correct depth and angle so the heads sit flush without cutting into the shingle. We adjust the pressure for each material, because over-driven nails tear the mat and void the warranty.
Cuts shingles cleanly at valleys, hips, and rake edges. A sharp cut matters more than people think, because a ragged edge is where wind starts to lift the shingle.
Pulls old shingles and flashing during tear-off and sets new flashing at walls and chimneys. We also use the pry bar to probe the deck for soft spots before we cover anything up.
Snaps straight reference lines across the deck so every course of shingles runs true. A roof that is out of line by an inch at the eave is off by several inches at the ridge.
Gets the crew on and off the roof safely and keeps them tied off while working near the edge. Every crew member is OSHA safety certified and wears a harness on any roof over 6 feet.
Clears debris from valleys and gutters, then picks up stray nails from the lawn and driveway. We run the magnetic sweeper at the end of every workday, not just at the end of the job.
We follow the GAF spec sheet on nail placement, underlayment overlap, and ventilation. That keeps your manufacturer warranty valid and gives you the longest possible life from the shingle. Improper installation is the number one reason shingle warranties get denied.
We apply a self-adhered membrane in the valleys, along the eaves, and around penetrations before the underlayment goes down. This is the layer that keeps water out if a shingle lifts in a windstorm. It is a small cost that prevents big leaks.
We measure your attic volume and calculate the net free area needed for intake and exhaust. Then we install a ridge vent and matching soffit vents. Balanced ventilation lowers attic temperature and extends shingle life in Texas heat.
Step flashing, counterflashing, and pipe boots are installed to the manufacturer's spec, not improvised on the roof. Flashing failure is the most common cause of leaks on a new roof, and it is the detail most crews rush.

We tear off the old roof, replace 4 sheets of rotten decking, and install architectural shingles with new flashing and ridge vent. The job takes 3 days and includes a manufacturer warranty plus our workmanship coverage. The homeowner stops patching a failing roof every spring and gets a 30-year system that sheds water at the chimney and vents the attic properly.
We meet the adjuster on the roof, confirm the scope, and order Class 4 impact shingles. Tear-off and installation take 3 days. We handle the permit and the final inspection with the City of Huntsville. The homeowner pays only their deductible and gets an upgraded roof that may qualify for an insurance discount on future premiums.
We install a TPO membrane with tapered insulation to create positive slope to the drains. Work is scheduled around tenant hours and takes 4 days. The white membrane reflects heat and reduces cooling load. Ponding stops, the roof carries a 15-year warranty, and the property manager sees lower summer cooling costs.
We inspect the roof, document its condition and remaining life, and issue the certification. If repairs are needed to pass, we quote them separately and complete them before closing. The sale closes on schedule, and the new owner gets a roof with documented remaining life and a clear repair history.
Huntsville sits in a hail and wind corridor, and the local building stock ranges from 1940s bungalows near the square to 1990s subdivisions and newer builds out toward Dodge. That mix matters. Older homes often have skip sheathing or 1x plank decking that needs to be brought up to code before a new roof goes on. Newer homes usually have plywood or OSB, but we still probe for soft spots from past leaks. Summer heat is brutal on shingles here, and attic temperatures can hit 140 degrees without proper ventilation. We size ridge vents and intake vents to the attic volume, not to whatever is on the truck. Winter brings the occasional freeze, which is why we install ice and water shield along the eaves even though it is not always required. If you are looking for a professional roof installation in Huntsville Texas, we handle the permit with the City of Huntsville, schedule the final inspection, and give you the paperwork at the end. We work in ZIP 77340, 77320, and 77341 regularly, and we know which neighborhoods have the steepest pitches and the oldest decks.
Older homes near the square often have plank decking and multiple roof planes. We replace soft boards and re-flash chimneys that have been patched several times over the decades.
A mix of 1980s and 1990s homes with steep pitches and complex valleys. Hail claims are common here, and we document damage carefully for adjusters.
Larger lots with mature trees, which means more debris in valleys and gutters. We blow out gutters and check for limb damage during every inspection.
Rural properties with barns and outbuildings that often need corrugated metal or standing seam metal roofing rather than shingles.
Newer construction with plywood decks and simple gable roofs. These install quickly, usually 2 days, and take well to architectural shingles.
Shingles bruise and granules loosen even when the roof looks fine from the ground. We inspect after every major hail event and document damage for insurance claims.
Heat bakes shingles from underneath and shortens their life. We install balanced ridge and intake ventilation to keep the deck cooler and extend roof life.
Ice dams can form at the eaves and push water under shingles. We install ice and water shield along the eaves and in valleys to prevent it.
Water finds every flashing failure and clogged gutter. We check step flashing, pipe boots, and gutter pitch during every installation and repair.
A 1,900-square-foot ranch in Crabbs Prairie had a 19-year-old three-tab roof with granule loss in the gutters and two active leaks at the pipe boots. The homeowner had patched it twice in three years and was tired of chasing leaks every spring.
We tore off the old roof, replaced 5 sheets of rotten decking, and installed Class 4 architectural shingles with new pipe boots, drip edge, and ridge vent. The job took 3 days. The homeowner paid their deductible and got a 30-year roof with a manufacturer warranty.
Maintenance: We recommend a fall inspection to clear gutters and check the ridge vent. Keeping the attic ventilated and the gutters clear is the cheapest way to get the full 30 years out of the shingles.
A small commercial building near the square had a modified bitumen roof that ponded water 2 inches deep after every hard rain. The seams were failing and the tenant had reported a ceiling stain twice in one year.
We installed a TPO membrane with tapered insulation to create positive slope to the drains. Work was scheduled around tenant hours and took 4 days. Ponding stopped, and the white membrane dropped summer cooling costs noticeably.
Maintenance: We inspect the membrane and drains twice a year, usually spring and fall. Clearing debris from the drains is the single most important thing to keep a flat roof draining properly.
A barn in Phelps had corrugated metal panels lifted and dented by a spring windstorm. Rain was blowing in at the ridge and soaking hay stored inside. The owner needed a fast fix before the next storm.
We replaced the damaged panels, re-secured the ridge cap, and installed new closure strips at the eaves. The job took 2 days. The barn is dry again, and the new panels match the existing profile so the repair is hard to spot.
Maintenance: We check the fasteners and ridge cap each spring. Replacing a few backed-out screws is a 20-minute job that prevents the panels from lifting in the next windstorm.
Most roofs do not fail all at once. They fail at the details, and by the time you see a stain on the ceiling, water has been getting in for months. Here are the problems we see most often in this area.
Water travels along rafters before it drips, so the stain is rarely under the actual leak. By the time you see it, insulation is wet and mold may be growing in the attic. We trace the leak to its real source using attic inspection and hose testing, then repair the flashing, pipe boot, or shingle causing it. If the roof is near the end of its life, we quote a full replacement instead of throwing money at patches.
Once shingles lift, the underlayment is exposed to UV and rain. A single missing shingle can let water into the deck within one storm season, and the damage spreads from there. We document the damage for your insurance claim, then replace the affected shingles or the full field if the storm took out too many. We match the shingle profile and color so the repair blends in, and we check the ridge and flashing while we are up there.
Hail knocks granules loose and bruises the mat underneath. The shingle looks fine from your driveway but has lost years of life. Insurance adjusters look for this, and so do we. We inspect the roof after every hail event, photograph the bruising, and meet your adjuster on the roof. If the damage is widespread, we replace the roof through your claim. If it is isolated, we repair it and save your coverage for later.
Water backing up under the shingle edge rots the fascia and soffit, and can eventually reach the deck. It also pools at the foundation, which causes movement and cracks. We clear the gutters, repair or replace the damaged fascia and soffit, and re-pitch the gutters so they drain. During a roof installation, we install new drip edge and gutters at the same time so the edge is protected.
Heat trapped in the attic bakes the shingles from underneath and shortens their life by years. It also drives up cooling bills and can cause moisture problems in winter. We calculate the ventilation your attic needs and install a ridge vent with matching intake vents. Balanced ventilation keeps the deck cooler, which is one of the cheapest ways to get more years out of a new roof.

We had hail damage in the spring and three crews told us three different things. Pro Roofing walked the roof with our adjuster, showed us the bruised shingles, and had the claim approved the same week. Tear-off started on a Tuesday and they were done Thursday afternoon. The yard was cleaner than when they started. I found two nails with the magnet they left behind, which is two more than I found after the last roofer.
Our 1990s house had a leak at the chimney that two other roofers could not find. Pro Roofing traced it to failed step flashing, not the shingles. They replaced the flashing and the surrounding shingles in one day. That was three years ago and it has not leaked since. They also told us the rest of the roof had 5 or 6 years left, which saved us from replacing it too early.
We manage a small commercial building near the square with a flat roof that ponded water every time it rained. Pro Roofing installed a TPO membrane with proper slope to the drains. The ponding stopped and the white surface dropped our summer cooling costs noticeably. They scheduled the work around our tenants and finished in four days. Straight pricing, no change orders.
Most asphalt shingle roofs in Huntsville run $9,500 to $24,000 in 2026, depending on square footage, pitch, and whether the deck needs repairs. A basic 1,800-square-foot ranch with architectural shingles usually lands near the lower end. Metal and tile roofs cost more upfront but can last 40 to 50 years. We give you a fixed written price after we walk the roof, so you are not guessing.
A standard asphalt shingle roof takes 2 to 3 days from tear-off to final cleanup. Larger homes, steep pitches, or roofs with multiple valleys can stretch to 4 or 5 days. Metal roofing takes longer, usually 5 to 7 days. We give you a start date and a weather backup date, and we do not leave your roof open overnight. If rain is coming, we tarp and come back.
We do, and we have since 2000. Pro Roofing Huntsville covers the city and all of Walker County, including Pine Hill, Crabbs Prairie, and Phelps. We install asphalt shingles, metal panels, and flat roof membranes for homes and commercial buildings. Call us and we will schedule a free inspection, usually within a day or two. You will talk to someone local, not a call center.
Yes, the City of Huntsville requires a permit for roof replacement, and the fee is based on the roof area. We pull the permit for you and schedule the inspection. Skipping the permit can cause problems when you sell the house, and some insurance carriers ask for proof of a final inspection. We handle the paperwork so you do not have to stand in line at the building department.
Not seeing your question? Our local team can help you understand urgency, scheduling and what to expect.
Ask the local teamCall us any time, day or night. Our office answers from 8 a.m. to 6 p.m. Monday through Friday, and the emergency line stays open around the clock for active leaks and storm damage. Most Huntsville inspections get scheduled within 48 hours, and emergency calls get a same-day tarp.